The construction industry is a high-pressure environment marked by tight deadlines, slim profit margins, and the ever-present need to meet project timelines. While speed is often celebrated as a competitive edge, prioritizing it above all else can trigger a cascade of issues. These issues range from compromised safety to inflated costs and reduced quality, affecting both immediate outcomes and long-term project success.
A recent report from Construction Dive revealed that structural engineers rank the drive for speed as a significant factor influencing project outcomes. As developers, contractors, and stakeholders push for faster completion, recognizing the risks of haste becomes essential for safeguarding both people and profits.
Safety Risks and Worker Well-Being
Rushing construction timelines increases safety risks for workers. In fast-paced environments, safety protocols may be overlooked, site inspections shortened, and hazard assessments incomplete. Workers may feel pressured to cut corners, neglect vital safety procedures, or use improper tools and equipment to meet deadlines.
Structural engineers have voiced concern about accelerated schedules, especially in large-scale infrastructure projects. Insufficient time to assess site conditions or implement safety protocols heightens the risk of injuries and fatalities. For construction firms, this risk extends beyond human costs to include potential lawsuits, regulatory fines, and reputational damage.
The Occupational Safety and Health Administration (OSHA) identifies falls, struck-by incidents, and equipment-related accidents as part of the “Fatal Four” leading causes of construction fatalities. When speed is prioritized, these risks increase. Addressing them requires more than compliance with OSHA standards—it demands a cultural shift where safety is prioritized over speed.
Compromised Quality and Structural Deficiencies
Speed-driven construction often comes at the expense of quality. When contractors are pressed to meet aggressive deadlines, attention to detail can wane. Materials might be installed incorrectly, manufacturer guidelines may be ignored, and crucial inspections could be rushed or skipped. Such lapses can result in structural defects, like improperly cured concrete, misaligned components, and undetected cracks or leaks.
Fast-tracked projects also reduce the time allocated for thorough engineering reviews, which increases the risk of structural deficiencies. These deficiencies may not surface until after project completion, by which time repairs are significantly costlier. Without adequate time for design adjustments, coordination between architects, engineers, and contractors suffers. Changes made on-the-fly during construction may not be properly vetted, causing misalignments between plans and execution.
Increased Project Costs and Rework
Ironically, the pursuit of speed often results in higher project costs. While the intent is to save time and reduce labor expenses, mistakes caused by haste frequently lead to costly rework. This can involve demolishing and rebuilding flawed structures, replacing substandard materials, and correcting improperly installed systems.
Industry studies reveal that rework can account for 5-15% of a project’s total cost—a significant financial burden for large-scale infrastructure projects. Delays caused by rework extend project timelines and may trigger penalties for late delivery. Fast-tracked schedules also limit the time available for design review and clash detection. Without these critical processes, unexpected design conflicts arise during construction, driving up costs further.
Supply Chain Disruptions and Material Shortages
Fast-tracked construction demands seamless coordination with suppliers and subcontractors. However, supply chain disruptions—like material delays, labor shortages, or equipment backorders—can derail even the most well-planned schedules. When the construction industry relies on just-in-time delivery, any disruption can trigger a domino effect of delays.
The COVID-19 pandemic exposed vulnerabilities in global supply chains, causing material shortages that still affect the industry. Under time pressure, contractors may resort to sourcing alternative or substandard materials, increasing the risk of quality issues. Moreover, expedited shipping and last-minute procurement come with premium costs, inflating overall project expenses.
Reduced Collaboration and Communication Breakdowns
Effective communication is essential for construction success, but fast-tracked schedules can erode collaboration. Team members may hesitate to raise concerns or seek clarification, fearing they’ll cause delays. This reluctance increases the likelihood of miscommunication, errors, and rework.
Collaboration among structural engineers, architects, and construction managers is crucial for project integrity. Fast-track projects often leave little time for coordination meetings or collaborative problem-solving, increasing the risk of overlooked design flaws. When issues are discovered late in the process, they become costlier and more difficult to resolve.
Regulatory Compliance and Legal Exposure
Compliance with building codes, zoning laws, and environmental regulations is a non-negotiable aspect of construction. However, when speed takes priority, there’s a tendency to bypass or rush regulatory requirements. Insufficient time for permit approvals, inspections, and code compliance can lead to violations, work stoppages, and legal disputes.
Structural engineers have raised alarms about fast-tracked schedules that compromise code compliance. Skipping necessary reviews and inspections exposes construction firms to legal liability and financial penalties. This risk extends to developers, project owners, and subcontractors, all of whom may be held accountable for regulatory breaches.
How to Mitigate the Risks of Speed-Driven Construction
To strike a balance between speed and precision, construction firms must adopt strategies that promote safety, quality, and efficiency. Here are key measures to mitigate the risks of speed-driven construction:
- Plan Realistic Schedules: Avoid “crash scheduling” and build project timelines that allow for thorough design reviews, inspections, and site preparation.
- Invest in Technology: Use Building Information Modeling (BIM) tools to identify potential design clashes early and ensure proper coordination among stakeholders.
- Prioritize Safety Training: Foster a culture where safety takes precedence over speed, provide ongoing training, and encourage workers to report hazards without fear of retribution.
- Build Contingencies: Allocate extra time and budget for potential disruptions, including rework, material delays, and labor shortages.
- Enhance Communication: Encourage open communication between architects, engineers, and contractors, and schedule regular collaboration meetings to resolve design issues early.
- Commit to Regulatory Compliance: Appoint a compliance officer to oversee regulatory adherence, permit approvals, and inspection protocols to ensure all work meets code requirements.
How SiteMap® Helps Keep Your Construction Projects On Track
GPRS offers services to help construction firms stay on schedule, on budget, and safe. Their subsurface damage prevention, site condition documentation, and construction project management services provide vital support to project teams.
GPRS’s SIM-certified Project Managers use advanced tools like ground-penetrating radar (GPR) and electromagnetic (EM) locating to map buried utilities and subsurface features, allowing contractors to dig, cut, or core with confidence. And our 3D laser scanning, and mapping and modeling services provide a comprehensive view of aboveground and underground site conditions.
All project data is available 24/7 through SiteMap®, GPRS’s project and facility management platform. This real-time access to accurate site data enhances project planning, safety, and efficiency, ensuring construction firms stay on track while mitigating costly risks.
GPRS’ SiteMap® team members are scheduling live, personal demonstrations. Schedule your free demo today.